Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 6 results ...

Al-Reshaid, K, Kartam, N, Tewari, N and Al-Bader, H (2005) A project control process in pre-construction phases: Focus on effective methodology. Engineering, Construction and Architectural Management, 12(04), 351–72.

  • Type: Journal Article
  • Keywords: Organizational conflict; inflation; contingency planning; control systems
  • ISBN/ISSN: 0969-9988
  • URL: http://miranda.emeraldinsight.com/vl=981848/cl=93/nw=1/rpsv/cw/mcb/09699988/v12n4/s3/p351
  • Abstract:
    Purpose - It is a well-known fact that the construction industry always passes through two distinctive problems during the construction stage: slippages of project-schedules, i.e. time-frame, and overruns of project-costs, i.e. budget. However, limited literature is available to solve or dilute these two problems before they even occur. It is strongly believed that the bulk of the two mentioned problems can be mitigated to a great extent, if not eliminated, provided that proper attention is paid to the pre-construction phases of projects. Normally projects are implemented through traditionally old techniques which generally emphasize only solving "construction problems during the construction phase". The aim of this article is therefore to unveil a professional methodology known as Project Control System (PCS) focusing on pre-construction phases of construction projects. Design/methodology/approach - In this article, the authors share the lessons learned during implementation of Kuwait University projects worth approximately 400 million in a span of ten years. The task of the project management/construction management (PM/CM) is being provided to the university by a joint venture team of international and local specialists. Findings - The pre-construction methodology ensures smooth and successful implementation during construction phases of the projects as they are generally executed in a fast-pace, deadline-driven and cost-conscious environment. The intuitive proactive methods, if implemented during pre-construction stage, automatically answer the questions that are encountered during the execution periods of projects. Originality/value - In this article, the authors share the lessons learned during PM/CM during projects over a span of ten years, which could be of use to others.

John, G A, Clements-Croome, D J, Fairey, V and Loy, H M (2005) Contextual prerequisites for the application of ILS principles to the building services industry. Engineering, Construction and Architectural Management, 12(04), 307–28.

Obonyo, E, Anumba, C and Thorpe, T (2005) APRON: an agent-based specification and procurement system for construction products. Engineering, Construction and Architectural Management, 12(04), 329–50.

Shang, H, Anumba, C J, Bouchlaghem, D M, Miles, J C, Cen, M and Taylor, M (2005) An intelligent risk assessment system for distributed construction teams. Engineering, Construction and Architectural Management, 12(04), 391–409.

Teo, E A L, Ling, F Y Y and Ong, D S Y (2005) Fostering safe work behaviour in workers at construction sites. Engineering, Construction and Architectural Management, 12(04), 410–22.

Zhang, H and Tam, C M (2005) Consideration of break in modeling of construction processes. Engineering, Construction and Architectural Management, 12(04), 373–90.